Latest Update: August 23rd- Interior Progress The Main House - Creations' Latest Project From Permit to Completion - watch the progress by tuning in here to get updates. What is The Main House? The building has approximately 8,000 square feet so we will have 6 bedrooms upstairs (each with it's own bath!!), an elevator to get you there and lots of room downstairs for sewing and quilting. We'll provide a list of the best restaurants in town so guests can have plenty of dining options.
This project is in the very early phase, but we can report that we have already gutted the inside AND we've gotten the permit for the remodeling. This was a major milestone - it was no small feat to get the plans approved by the city. Luckily our Project Manager, Linda Coffee, navigated us through the maze of city codes and the process went very smoothly and now We Have Our Permit! |
Permit Party - Saturday, September 26th Our Project Manager, Linda Coffee was on hand to show her beautiful plans and explain them. That's Linda in the red jacket, explaining the plan drawings to visitors. |
We are thrilled to have PDF files of the 4 drawings that Linda had on display during the Permit Party. So, if you missed the party, or just want to look at the plans again, all you have to do is download our drawings using the links below. |
| We couldn't resist putting some mini-pictures of the drawings here, but just click on each title or drawing to see or download the actual PDF file. Each of these images is just a representative part of the full drawing. Be aware, these files are pretty big - so we don't recommend you click them if you have slow, or dial-up, Internet connections. The file sizes are provided in parentheses. |
Front and Back Exterior Views PDF ( size: 744 KB) ![]() Image above shows front exterior view. |
|
Side Exterior Views PDF (size: 288 KB) ![]() Image above shows west side exterior view. |
Downstairs Interior Drawing PDF (size: 1008 KB) ![]() Image above shows part of the downstairs interior. |
Upstairs Interior Drawings PDF (size: 556 KB) ![]() Image above shows part of the upstairs interior drawing. |
What's Next? We'll update this page periodically as we have progress to report, so bookmark it and check back in occasionally. |
|
November 23rd: Let the Deconstruction Begin... Here is the latest view of the front.
|
|
|
March 12th:
|
Side view - the roof is returning... |
Back view - the roof is returning... ![]() |
| April 26th: | |
Front view - Tyvek everywhere... |
Another Front View - Siding in some places |
![]() |
![]() |
Side view - (the view from Creations) |
Front / Side corner |
![]() |
![]() |
As you can see, the outside is coming along great! So, we thought you would be interested in seeing what is happening inside. We want to show you the future ... classroom, hospitality rooms, bedrooms, stairs and... yes there will be an elevator. |
|
Classroom |
Downstairs Eating area |
![]() |
![]() |
Upstairs Hospitality Room |
Upstairs Future Bathrooms |
![]() |
![]() |
Upstairs Hallway |
Inside Stairway |
![]() |
![]() |
Inside Somewhere |
Can anyone guess what this is? |
![]() |
![]() |
June 28th:
|
|
August 23rd: But, first here's a current Front Exterior View. |
|
Future Classroom |
Downstairs Eating area |
![]() |
![]() |
Going Down! |
Inside Stairway |
![]() |
![]() |
Hallway |
|
![]() |
We love this picture! It shows that there is " Light at the end of the Tunnel!" Some day, we will have a completed Main House, ready for guests! |
| We are getting so many progress photos on this report, our webmaster thought it would be fun to have a page showing all the progress photos together for each each view of the building. Visit our Main House Side-by-Side Comparison Photos page to see how drastically each view of the building is changing over time. | |
| |
|
|||||
| Creations 1013 Main Kerrville, TX 78028 (830) 896-8088 www.creations-online.com |
|
|